51.2V off-grid · compact fixed storage

OV-B51-100T

A 51.2V 100Ah LiFePO4 starting point for smaller fixed off-grid systems where energy demand, inverter power and charging architecture are reviewed together.

Nominal voltage51.2V
Rated capacity100Ah
Rated energy5120Wh
Published continuous discharge100A*
Outravira OV-B51-100T 51.2V 100Ah LiFePO4 battery

01 · Use case

Who It Is For

Use a measured load profile—not voltage alone—to decide whether this configuration belongs on the shortlist.

A starting point for compact fixed off-grid systems.

  • Cabins, remote work sites and small fixed solar systems
  • Projects moving beyond 12V or 24V because continuous power and cable current justify review
  • Installers who can confirm inverter, MPPT, protection and commissioning settings
  • Not a drop-in universal replacement: the complete system must be approved

02 · Public reference baseline

Confirmed Specifications

These values support initial screening. The approved quotation and signed project specification control the production order.

Battery chemistryLiFePO4Integrated BMSYes
Nominal voltage51.2VRated capacity / energy100Ah / 5120Wh
Published continuous discharge100A*Dimensions560 × 352 × 150mm*
Weight47.5kgCharge settingsTo be confirmed in signed specification
Communication / parallel limitsTechnical review requiredEnvironmental ratingTo be confirmed

*Project confirmation required: verify measurement boundary, support/bracket allowance, current conditions, BMS limits, terminals, charging values and selected-market version before installation.

03 · Electrical review

System Compatibility

51.2V is a system architecture starting point, not evidence that any inverter or charger is compatible.

Match the complete power path.

  • Daily energy, peak load, surge load and autonomy target
  • Inverter/charger battery-voltage window and charge profile
  • MPPT limits, solar array voltage/current and backup charging
  • BMS current, protection, communication and expansion requirements

Approval boundary

Inverter compatibility, communication protocol, parallel quantity, certification, cycle life and warranty remain unconfirmed until the exact project version is supported by written evidence.

04 · Site review

Installation Inputs

Submit the cabinet location, service access, cable route and environmental conditions before approving the enclosure.

01

Envelope

Published reference: 560 × 352 × 150mm, excluding fixed support. Confirm tolerances and service clearances.

02

Weight & support

Published reference: 47.5kg. Confirm wall/floor structure, anchoring and handling method.

03

Electrical interfaces

Confirm terminals, polarity, cable size, isolation, fuse/breaker and earthing design.

04

Environment

Confirm temperature, moisture, dust, ventilation, altitude and approved installation orientation.

05 · Evidence pack

Documents Available

Status applies only to the exact approved version; similar-model reports are not treated as evidence.

Public Reference Values

Available

Voltage, capacity, energy, published discharge, dimensions and weight for initial screening.

Datasheet

Project confirmation required

Request the signed electrical and mechanical version before order approval.

Dimension Drawing

Project confirmation required

Final enclosure, supports, terminals, clearances and tolerances must match the sample.

UN38.3

Project confirmation required

Verify report identity against the ordered battery version before transport planning.

Installation Guide

Project-specific

Prepared around approved equipment, protection, mounting and commissioning inputs.

Communication Protocol

After technical review

Required only when the selected BMS and inverter integration are confirmed.

06 · System review

Request a Compatibility Review

Send daily energy, peak and surge loads, autonomy target, solar array, MPPT, inverter/charger, backup charging, installation environment and expansion plan.

Expected output

System starting pointVoltage and capacity shortlist with open assumptions
CompatibilityKnown matches, risks and evidence still required
CommissioningProject-specific settings and checks after approval
Start off-grid reviewRequest model compatibility review →