Loads & energy
Daily Wh/kWh, continuous power, short surge, duty cycle and critical loads.
For small off-grid solar installers
Share the load profile, autonomy target, solar window, inverter and site conditions. Outravira turns them into a product starting point, an open-risk list, and the evidence needed before quotation and commissioning.
One review path
01 · System Design Brief
A model name is the output of the first review, not the starting requirement.
Daily Wh/kWh, continuous power, short surge, duty cycle and critical loads.
Days without useful solar, seasonal solar window, generator or grid backup.
Inverter/charger, MPPT, array configuration, protection and monitoring models.
Space, structure, temperature, dust, moisture, altitude and future load growth.
02 · System Starting Points
These are configurable discussion points for project review, not universal system recommendations or fixed production promises.
12.8V · 200Ah · 2560Wh for compact low-voltage requirements.
View product details →25.6V · 100Ah · 2560Wh for projects with a confirmed 24V architecture.
View product details →51.2V · 100Ah · 5120Wh fixed-storage starting point.
View product details →51.2V · 200Ah · 10240Wh vertical project baseline.
View product details →Portable backup and rapid-deployment route
Use a portable station when mobility, fast setup or temporary backup matters more than a permanently installed battery bank. It is not presented as a substitute for a designed fixed 51.2V system.
03 · Compatibility & Commissioning
The approved configuration links the battery version, inverter/charger, MPPT, protection, wiring and commissioning record.
04 · Remote Diagnostic & Support
Remote support starts from the approved system record and the actual fault evidence—not a generic replacement promise.
Serial, batch, installed equipment, settings and recent system changes.
Photos, measurements, alarms, logs, load state and environmental conditions.
Battery, charging, load, connection, configuration or environmental cause.
Corrective action, responsibility path, parts and final project record.
05 · Documents & Evidence Status
Evidence status follows the exact model, BMS, inverter integration, destination and ordered configuration.
Captures loads, autonomy, solar, equipment, site and expansion inputs.
Records supported, rejected and still-unconfirmed equipment combinations.
Prepared only after the exact electrical and mechanical configuration is approved.
Report and certificate identities must match the ordered version and destination.
Connects symptoms, evidence, diagnosis, action and responsibility.
Start with what you know