RV & off-grid channels

Build the RV and off-grid range your channel can support.

Start with the buyer, loads, charging access, available space, destination, and route to market. Outravira helps turn those inputs into an installed battery, portable power, or combined product brief.

Four business customers

One market, four different buying jobs.

The same product should not be presented to an installer, a retailer, and a private-label distributor in the same way.

01RV Conversion Businesses

Installed-system inputs, space, charging, and handover documentation.

02RV & 4WD Accessory Dealers

A clear range for different trip lengths, budgets, and buyer confidence.

03Small Off-Grid Solar Installers

System boundaries, compatibility questions, and controlled project records.

04Private-Label Distributors

Branding, packaging, listing assets, samples, and order coordination.

Small off-grid solar installers

Move from a product shortlist to a system review.

Define loads, autonomy, solar, inverter, installation and commissioning before selecting the battery.

Review the installer program

Choose the starting system

Installed System or Portable Power?

Select one family or build a channel range across both. Final product facts remain project-confirmed.

DecisionInstalled LiFePO4 systemPortable power station
Best starting fitVehicle integration, longer-term DC loads, solar and DC-DC chargingFast retail adoption, mobile loads, no permanent battery installation
Buyer inputsBattery space, voltage, loads, inverter, wiring, charging sourcesContinuous and peak loads, AC standard, charging inputs, ports, weight
Channel roleRV conversion, solar installation, replacement and upgrade programsAccessory dealers, outdoor retail, mobile work, private-label programs
DocumentationDimensions, installation limits, compatibility and system handoverInterface map, charging guide, output limits, packaging and user guide

Installed battery systems

Six project starting points

View battery details →
Weekend

OV-B12-100

Essential DC loads and shorter trips.

Touring

OV-B12-150H

12.8V · 150Ah · 1920Wh known starting configuration.

Long Stay

OV-B12-200

Higher-capacity direction for longer off-grid requirements.

Compact 24V

OV-B24-50

25.6V · 50Ah · 1280Wh compact starting configuration.

Core 24V

OV-B24-100

25.6V · 100Ah · 2560Wh core 24V direction.

PRO 24V

OV-B24-100P

25.6V · 100Ah · 2560Wh alternate enclosure direction.

Portable power stations

Seven portable power platforms

View portable details →
Grab & Go

OV-P500

Camping, lightweight loads, and entry retail.

RV & Remote Work

OV-P1000

RV accessories, Starlink, computers, and field electronics.

Higher Output

OV-P1500

Appliances, tools, events, and professional channels.

Maximum Reserve

OV-P4000-5K

4000W · 5000Wh · pure sine wave for projects that prioritize longer reserve.

Discuss this platform →

Load & runtime brief

Bring the inputs before asking for a runtime promise.

The first version uses a requirements table rather than a calculator. Examples illustrate the questions, not a guaranteed result.

FieldExampleWhy it matters
Appliance / Load12V fridgeDefines the job
Rated Power60WStarts the load estimate
Daily Runtime / Duty Cycle10h / 40%Prevents a full-day nameplate assumption
Quantity1Builds total demand
Required Days Off-Grid2 daysSets the energy reserve target
Charging SourcesDC-DC + solarShows replenishment conditions
Inverter LoadsCoffee machineHighlights peak and AC requirements
Battery SpaceCustomer measurementConstrains an installed system
Product FormatInstalled / portable / combinedSelects the product path
AC StandardDestination voltage, frequency, and socketConfirms destination output and socket needs
Portability LimitTarget weight, wheels, handlesSets the mobile product expectation

Runtime examples must state usable energy, conversion loss, duty cycle, and charging assumptions.

What we prepare

Six sample deliverables for a clearer buying process.

Each item is a sanitized example template until authorized project evidence is available.

Sample deliverable

Product Shortlist Matrix

Example template

Configuration Confirmation Sheet

Sample deliverable

Private-Label Artwork Proof

Example template

Packaging & Manual Checklist

Sample deliverable

Product Listing Asset Pack

Example template

Pre-Shipment Review Record

Requirements to confirm

Destination Documentation Checklist

Transport evidence, product documents, vehicle installations, and stationary systems are separate confirmation tracks for every destination market.

01

Battery transport

Match the final battery pack and shipment route to the applicable transport file set, including pack-level UN 38.3 evidence where required.

02

Product configuration

Confirm the exact battery, inverter, charger, sockets, labels, warnings, and user documentation for the selected version.

03

RV / transportable installation

Installation requirements must be confirmed by the responsible qualified party for the vehicle and destination.

04

Stationary ESS boundary

Do not reuse an RV or portable-power statement as proof for a fixed residential energy storage system.

What we can help you solve

Start with your need—not an internal project type.

01

Product & System Selection

For a real vehicle, load list, runtime, charging, and space requirement.

Share your requirements
02

Resale Range Planning

For an entry, core, and higher-demand range across one or both product families.

Plan a resale range