Private-Label Program

Build a mobile energy range your brand can approve, launch, and support.

Outravira does not simply add a logo to an existing product. We help turn a product platform into a configured, approved, packaged, launch-ready, and supportable version for your brand.

Choose the right depth

Three customization levels—with different cost, risk, and timing.

We first confirm how much change the market actually needs. A logo change and a new product project should not follow the same approval path.

01 · LOWEST COMPLEXITY

Fast Rebrand

Use a validated platform with a controlled brand layer.

  • Logo and rating-label artwork
  • Available standard product color
  • Brand carton and manual cover
  • Standard accessories and configuration
Best for

Testing a channel with the lowest change risk.

02 · MARKET CONFIGURATION

Market-Configured Range

Adapt the approved platform to the destination and channel.

  • AC socket, charger, cable, and accessory version
  • Language, warning, label, and packaging scope
  • Range architecture and product comparison assets
  • Destination-market document checklist
Best for

Distributors building a coherent, sellable range.

03 · ENGINEERING PROJECT

Custom Product Project

Change the product itself under a separate technical review.

  • Enclosure, panel, interface, or capacity direction
  • BMS, communication, software, or control logic
  • Tooling, validation, and certification planning
  • Higher MOQ, engineering cost, and longer lead time
Best for

Established volume with a defensible market requirement.

Starting routes

Start from the product family your channel needs.

These are configurable project baselines—not fixed promises that every option is available on every model.

RV & 4WD

Installed Battery Range

12V, 24V, and project-reviewed 51.2V directions with labels, manuals, application guidance, and compatibility inputs.

Review battery platforms →
RETAIL & MOBILE WORK

Portable Power Range

Compact to high-capacity portable platforms organized around end-user loads, channel positioning, and launch assets.

Review portable platforms →
SMALL OFF-GRID

Energy Storage Range

A project-led route covering load profile, solar, inverter, communication, environment, commissioning, and expansion.

Review the installer program →

Stage-gated delivery

From market brief to supported launch.

Each gate produces a record. Production does not rely on a trail of disconnected chat messages.

  1. 01Market & Product BriefMarket, channel, product family, target buyer, and business objective.
  2. 02Feasibility ReviewAvailable platform, requested changes, evidence gaps, risk, and open items.
  3. 03Configuration & QuotationVersion, scope, deliverables, price basis, quantity, and assumptions.
  4. 04Artwork ProofLabel, marks, warnings, carton, manual, and file ownership.
  5. 05Branded SamplePhysical review of appearance, configuration, accessories, and packaging.
  6. 06Golden Sample ApprovalThe approved reference is signed off before pilot or production.
  7. 07Pilot OrderControlled first batch for channel, installation, and support feedback.
  8. 08Mass ProductionBuild against the approved version and recorded exceptions.
  9. 09Pre-Shipment ReviewQuantity, appearance, labels, accessories, documents, and agreed checks.
  10. 10Launch & Warranty SupportListing assets, issue intake, evidence path, responsibility, and records.

Visible launch-pack examples

See what is controlled before the product reaches your channel.

These are sanitized example structures. They demonstrate the expected deliverable, not an approved customer project.

YOUR BRANDMODEL / RATING LABELIdentity · electrical data · marks · warnings · revision

Label & Artwork Proof

One review sheet connecting the approved logo, product identity, rating data, warning copy, marks, placement, and revision.

PACKAGING CONTROL✓ Product identity✓ Carton artwork✓ Accessories✓ Manuals & inserts✓ Barcode / QR

Packaging Checklist

A packing-level record for carton, inserts, cables, accessories, labels, barcode, language, and inspection points.

OWNER'S MANUAL01 Safety02 Product & ports03 Charging & operation04 Limits & troubleshooting05 Warranty route

Manual Outline

A version-controlled content outline tied to the approved product, target market, warnings, operating limits, and support route.

Market & compliance boundary

Who provides, coordinates, and approves each input?

A document list is not the same as market approval. Responsibilities are agreed for the specific product version and destination.

PartyPrimary inputs and responsibilitiesApproval boundary
Brand owner / buyerTarget market, channel, importer or responsible-party details, brand files, claims, language, commercial requirements, and known local rules.Approves the commercial brief, artwork, Golden Sample, launch claims, and order.
OutraviraCoordinates the product-version record, market checklist, document matching, artwork workflow, sample review, launch assets, and change records.Confirms only the evidence and deliverables recorded for the approved project version.
Approved production partnerSupplies exact-model technical inputs, production feasibility, available reports, manufacturing records, and agreed inspection evidence.Confirms factory-controlled product and production evidence in writing.
Local licensed or authorized partyDetermines local electrical design, installation, inspection, registration, approval, or responsible-person obligations where applicable.Retains responsibility for local professional approval and installation compliance.

Golden Sample & change control

Protect the version your team approved.

The Golden Sample is supported by records—so appearance, key components, accessories, packaging, and documents do not quietly drift after approval.

01

Approved Version Record

Locks the approved model, enclosure, panel, ports, configuration, accessories, label files, packaging, manuals, and open exceptions.

02

No substitution without written approval

Cells, BMS, inverter, charger, socket, key materials, and other agreed controlled items cannot be changed silently.

03

Engineering Change Request

Records the reason, affected parts, risk, evidence, inventory impact, and required re-approval before a change is accepted.

04

Shipment Version Review

Checks the shipment against the approved records and captures authorized deviations before release.

Commercial planning examples

Know which commercial items still require project confirmation.

Red entries are sample data for website completeness only. They are not quotations, promises, or universal terms.

Neutral sample

Sample / To be confirmed: one evaluation unit may be available after platform review.

Branded sample

Sample / To be confirmed: 10–15 days after approved artwork and configuration.

Pilot order

Sample / To be confirmed: quantity depends on product platform and customization depth.

Production order / MOQ

Sample / To be confirmed: separate MOQ for product, color, packaging, manual, and accessories.

Production lead time

Sample / To be confirmed: 30–45 days after approval and deposit.

Payment terms

Sample / To be confirmed: 30% deposit and balance before shipment.

Quotation validity

Sample / To be confirmed: 15 days, subject to configuration and material review.

Warranty term

Sample / To be confirmed: 3–5 years by approved model and written warranty scope.

These values remain deliberately visible in red until Outravira confirms the applicable supplier, model, destination, quantity, and contract terms.

Start with the commercial reality

Tell us what you want to sell, where you want to sell it, and how much change you actually need.

The brief captures your market, product direction, customization level, brand readiness, documentation needs, launch assets, volume, timing, and support expectations.

Prepare My Private-Label Brief